Today I’ve been catching up on Pure Portugal work, whilst Oli and Teresa finished making the steps for the Pirate Ship Slide.
Meanwhile Matt’s been busy making the shuttering for new steps up to the Mongolian Yurt from the Kitchen Caravan. We’ve reluctantly decided to make them out of concrete, as the wood and earth ones kept collapsing and so weren’t safe for guests.
After making the steps, Oli and Teresa set to work on a new bed in front of the main house, which will catch rainwater from the roof and provide next-to-the-table herbs and salads for easy picking and the freshest eating! I also want to grow kiwis up the wooden posts and over a new structure out front to shade the dining table.
That’s one wheelbarrow load of manure in the near end of the bed, and we reckon we’ll need a total of 15 loads barrowed up from the muck heap at the bottom of the land – 3 each for the 5 of us!